Mechanical Sampler (Truck Sampler) PLTU Ombilin

Years: 2018

The mechanical sampler functions to automatically collect coal samples from trucks in accordance with ASTM standards and guarantees sample precision and independence.

Mechanical Sampler (Truck Sampler) PLTU Ombilin​

Years: 2018

The mechanical sampler functions to automatically collect coal samples from trucks in accordance with ASTM standards and guarantees sample precision and independence.

Fly Ash Handling Retrofit PLTU Ombilin

Years: 2019

Fly Ash Handling Retrofit aims to obtain maximum fly ash transport results. The entire system was replaced and upgraded, including the air compressor, piping, economizer and bag filter, as well as the PLC control system.

Fly Ash Handling Retrofit PLTU Ombilin

Years: 2019

Fly Ash Handling Retrofit aims to obtain maximum fly ash transport results. The entire system was replaced and upgraded, including the air compressor, piping, economizer and bag filter, as well as the PLC control system.

Bottom Ash Handling PLTU Bukit Asam

Years: 2019

Retrofit Bottom Ash Handling aims to obtain clean and reliable bottom ash transport results. This work includes replacing the ash extractor, conveyor system, and modifying the silo as well as adding antiblocking to prevent material blocking.

Emergency Repair Reclaiming PLTU Sebalang

Years: 2020

This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.

Emergency Repair Reclaiming PLTU Sebalang

Years: 2020

This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.

Stone Crusher PT Bukit Asam

Years: 2020

This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.

Emergency Repair Ship Unloader PLTU Teluk Sirih

Years: 2020

This work includes repairing frames and conveyors that have fallen or been damaged due to. The duration of this work is quite short, namely 28 days because the ship unloader is really needed to maintain the coal supply to the PLTU unit.

Emergency Repair Ship Unloader PLTU Teluk Sirih

Years: 2020

This work includes repairing frames and conveyors that have fallen or been damaged due to. The duration of this work is quite short, namely 28 days because the ship unloader is really needed to maintain the coal supply to the PLTU unit.

Replacement Air Pre-Heater PLTU Ombilin

Years: 2022

This work is a total replacement of the Air Pre-heater which includes replacing tube sheets, tubes, expansion joints and insulation.

Replacement GRV to HDPE PLTU Ombilin

Years: 2022

HDPE pipes were chosen to replace GRV pipes because they are considered stronger and easier to maintain if a leak occurs. The HDPE pipe size at PLTU Ombilin is 1500mm which is quite large in Indonesia.

Replacement GRV to HDPE PLTU Ombilin

Years: 2022

HDPE pipes were chosen to replace GRV pipes because they are considered stronger and easier to maintain if a leak occurs. The HDPE pipe size at PLTU Ombilin is 1500mm which is quite large in Indonesia.

Replacement Hydraulic Power Unit Coal Mill PLTU Asam-asam

Years: 2023

Replacement of the Hydraulic Power Unit (HPU) for the Coal Mill because the existing system was single action, replaced with a new double action system along with the connection from the HPU to the DCS.