Years: 2018
The mechanical sampler functions to automatically collect coal samples from trucks in accordance with ASTM standards and guarantees sample precision and independence.
Years: 2018
The mechanical sampler functions to automatically collect coal samples from trucks in accordance with ASTM standards and guarantees sample precision and independence.
Years: 2019
Fly Ash Handling Retrofit aims to obtain maximum fly ash transport results. The entire system was replaced and upgraded, including the air compressor, piping, economizer and bag filter, as well as the PLC control system.
Years: 2019
Fly Ash Handling Retrofit aims to obtain maximum fly ash transport results. The entire system was replaced and upgraded, including the air compressor, piping, economizer and bag filter, as well as the PLC control system.
Years: 2019
Retrofit Bottom Ash Handling aims to obtain clean and reliable bottom ash transport results. This work includes replacing the ash extractor, conveyor system, and modifying the silo as well as adding antiblocking to prevent material blocking.
Years: 2020
This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.
Years: 2020
This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.
Years: 2020
This work is a total replacement of the burned reclaiming line, including replacing the frame, bracket, roller, magnetic separator, and the entire conveyor and crusher electrical system including upgrading the crusher’s PLC control system.
Years: 2020
This work includes repairing frames and conveyors that have fallen or been damaged due to. The duration of this work is quite short, namely 28 days because the ship unloader is really needed to maintain the coal supply to the PLTU unit.
Years: 2020
This work includes repairing frames and conveyors that have fallen or been damaged due to. The duration of this work is quite short, namely 28 days because the ship unloader is really needed to maintain the coal supply to the PLTU unit.
Years: 2022
This work is a total replacement of the Air Pre-heater which includes replacing tube sheets, tubes, expansion joints and insulation.
Years: 2022
HDPE pipes were chosen to replace GRV pipes because they are considered stronger and easier to maintain if a leak occurs. The HDPE pipe size at PLTU Ombilin is 1500mm which is quite large in Indonesia.
Years: 2022
HDPE pipes were chosen to replace GRV pipes because they are considered stronger and easier to maintain if a leak occurs. The HDPE pipe size at PLTU Ombilin is 1500mm which is quite large in Indonesia.
Years: 2023
Replacement of the Hydraulic Power Unit (HPU) for the Coal Mill because the existing system was single action, replaced with a new double action system along with the connection from the HPU to the DCS.
Commpark blok J7, Kota Wisata, Limus nunggal, Kec. Cileungsi, Kab. Bogor, Jawa Barat. 16820
Quick Links
Contact Us
+62 815-9128-139
Operational Hours
Customer Service 08.00 – 17.00
© ADIWANGSA 2023, All Rights Reserved